Inside the chapel the insulators have finished which allowed the Sheetrockers to come in and hang the board. Both the Sanctuary and Fireside levels are completely sheetrocked. We are in the process of taping and mudding the joints.
Outside the
chapel the siding is being installed.
The framers continue to work on the back patio. And the excavators are building a rock wall which
will be 13’ feet high in some places, that will outline our parking lot.
As we head
towards Christmas we at Dooley Lodges have plenty to be thankful for and we
wish you and your families a Merry Christmas and a Happy New Year!