The plywood has been placed on the roof and the shingles are being installed. We should finish the roof this week.
The framers are continuing to work on the remaining list of things to do. The stairway between the Sanctuary and Fireside levels is being built as well as the front and back walls.
Some of the doors and windows have been delivered and they are being installed as they arrive. I was out fishing the other day and I took this picture from the lake. The resort, with the green roof, is on the left and the chapel, nestled in the woods, is on the right.
We have received a lot of lighting recently. This chandelier is one of 4 that will be running down the middle of the sanctuary level. We are thinking about decorating them with some crystals.
No comments:
Post a Comment