There has been a lot of progress over the last couple of weeks on the Chapel.  We have poured the concrete for the foundations and the walls.  The building is really taking shape now.  We have established the downstairs floor elevation and should be pouring it shortly after we rough in some plumbing.  The top of the concrete walls shown below will be the main floor elevation.  The view is still as spectacular as ever.


We are finalizing some of the interior details including the mantel for the lower level fireplace and some lighting including the chandeliers, fans and lighting fixtures for the bathrooms and ready rooms.  Our interior designer will soon have some of the interior renderings ready for us to post!  We  can't wait!

We are focusing on the parking lot as well.  We finalized the design, we have cleared the area and are bringing in lots of fill to establish the upper and lower levels.