Wednesday, September 13, 2017

Weekly Update

Wow!  A lot has happened over the last couple of days. The lower level's concrete floor is in!!  We are calling this level the  "Fireside Level" because it will have a fireplace on the rear wall with triple doors on either side.  You will be able to walk out on the rear porch (with a pergola roof) and look out toward the lake and woods.

  
 We are getting very excited!!  All the light fixtures have been ordered and they are starting to arrive!! The crystal chandelier & sconces for the Bride Ready room are beautiful!! They will be a perfect backdrop for bridal photos!!

The front porch will be 8ft deep and 12ft wide. The heavy wooden entry beams will be gothic shaped along with the two front windows of the stone chapel. The large hanging lantern will have matching wall lanterns on either side of the front wooden doors. We are trying to create an Old New England Stone Chapel with all of today's modern conveniences!!


The 4 petina'd chandeliers for the Chapel sanctuary have arrived!!  We can't wait to hang them!!  They will have dimmer switches to create the perfect wedding lighting. We are anxious to see how they are reflected on the 35ft. high glass wall overlooking the lake!


All the flooring is ordered: Wood flooring for the entire 1st floor (Sanctuary, Bride's Room & Office). There will be ceramic tile in all the restrooms and the commercial kitchen will have a commercial vinyl floor.  The lower level (Grooms Room, Fireside Room, Restrooms & rear porch)will have stained/glossed floors to match the wood floors. Pretty soon we will be picking out area rugs for the Groom's Room and for the large Fireside room!!

Keep watching for our weekly updates! Our 1st wedding in the chapel is in 8 months!! It will be here before we know it!!

No comments:

Post a Comment