Saturday, October 14, 2017

Heading Skyward



Now that the sanctuary floor has been completed there is nowhere to go but up!  Thanks to the framers, who are a hard working bunch of guys, we are making good progress with the building.

                             

Over the last 10 days they have installed the walls and the roof trusses for the sanctuary level.  These pictures face south which will be the wall with the floor to ceiling windows.  The view is still as spectacular as ever.

 

The framers built this  scaffold to work from while they installed the roof trusses.  We brought the crane back in to provide the heavy lifting.  Here they are installing the first roof truss.

    

 Here are a couple of pictures looking south towards the lake.  We are starting to get a good perspective of the 30'x70' sanctuary area in the chapel. In the end the 3 roof system was installed without a hitch