Tuesday, October 3, 2017

Moving Right Along



Wow!  We've been having fun.  We brought in a crane to do some of the heavy lifting.

  

With the help of the crane the framers were able to put the vertical and horizontal 12"x12"x12'(+/-) beams into place.  We now have the Fireside level completely framed in.

                                
 The beams became the support structure for the floor trusses for the main sanctuary level.

                        

Once the trusses were in place the crew was able to lay the deck for the main sanctuary level.  These pictures were taken at 7:00pm from the floor of the sanctuary for those looking for a spectacular backdrop.

No comments:

Post a Comment